Proposal ATCA_long_GRB Decision Flow Chart
Proposal Description: This is the triggering proposal for the large ATCA Long GRB program
Edit Proposal Settings
flowchart TD
A(Event) --> B{"Have we observed
this event before?"}
B --> |YES| D{"Is the new event further away than
the repointing limit (0.02 degrees)?"}
D --> |YES| R(Repoint)
D --> |NO| END(Ignore)
B --> |NO| C{Is Event from SWIFT?}
C --> |NO| END
C --> |YES| E{Source type?}
E --> F[GRB]
F --> J{"Fermi GRB probability > 50.0\nor\nSWIFT Rate_signif > 0.0 sigma"}
J --> |YES| K{"Event duration between
2.056 and 10000.0 s"}
J --> |NO| END
K --> |YES| L[Trigger Observation]
K --> |NO| M{"Event duration between
0.0 and 2.055 s
or
0.0 and 0.0 s"}
M --> |YES| N[Pending a human's decision]
M --> |NO| END
subgraph GRB
J
K
L
M
N
end
style N fill:orange,color:white
E --> G[Flare Star] --> END
E --> I[Neutrino] --> END
E --> H[GW] --> END
style A fill:blue,color:white
style END fill:red,color:white
style L fill:green,color:white
style R fill:#21B6A8,color:white